Coverage - Property Damage -
Construction Defect
F&H Construction v. ITT
Hartford Insurance Company of the Midwest
Court of Appeal, Third District
(May 5, 2026)
The issue of what constitutes "property damage" in a construction
defect setting can often be a difficult issue. This case examines that
question where there is no physical injury caused to property by a claimed
defect, but there is additional expense incurred to accommodate a defective
design.
F&H Construction contracted with Contra Costa Water District to build a
pumping plant. F&H subcontracted with L. O'Reilly & Sons, Inc.,
to supply 113 pile cap extensions to be welded into place on steel composite
piles, which were then driven into the ground. The specifications for the
pile caps required them to be fabricated with grade A-50 steel. Contrary
to the specifications, O'Reilly manufactured and delivered grade A-36 steel
caps. When F&H became aware of the difference in steel caps, all the
piles had been driven into place, and most of the caps had been welded onto the
piles. The caps were inadequate for the purpose of supporting the pumping
facility. F&H modified the existing caps to meet the design
requirements. This required modifications to both the caps in place and
those that had not yet been installed. The project was completed without
damaging or weakening the piles in any way.
F&H sued O'Reilly seeking to recover damages for the modification.
O'Reilly did not respond to the complaint, and a default judgment of
$243,064.37 was entered. F&H then sued ITT Hartford Insurance Group
(Hartford), insurer for O'Reilly, seeking to recover the amount of the default
judgment. On cross-motions for summary judgment, the trial court granted
Hartford's motion. Judgment was entered in favor of Hartford.
F&H appealed.
The Court of Appeal affirmed. The issue on appeal turned primarily on
whether there was "property damage." The Court noted that a
liability policy is not a performance bond or a warranty of the contractor's
performance. In this case, the only claim was for the modification of the
pile caps. The Court stated this was not property damage because it
consisted of intangible economic damages rather than damages to tangible
property. There was no damage to the piles or to any other
property. Rather, the piles were inadequate for their intended purpose.
The Court rejected the argument that "property damage" included
diminution in the value of a building resulting from the incorporation of a
defective component. The Court stated that cases that have so held were
based upon a pre-1973 definition of "property damage" which did not
include the term "physical" in its definition of the injury to
property required. This word was added in 1973, and courts have
interpreted it to mean there is no coverage for economic loss. The Court
therefore held that welding lower grade pile caps to the drilling piles did not
constitute physical injury to tangible property where the only injury shown was
that the welded structure failed to perform as intended.
Further, it did not constitute loss of use of tangible property that was not
physically injured. The Court stated this term means the rental value of
similar property where a plaintiff has been deprived of the use of his own
property. In this case, F&H did not seek damages for the rental value
for the loss of use of the facility during the time period modifications were
made to the pile caps or even for the period of time caused by the delay.
The reason for this was because the project was completed on time. The
costs incurred for repair and modification of the defective caps were unrelated
to the rental value.
The Court concluded by noting that liability insurance does not cover
inferior or defective workmanship. The trial court properly granted
summary judgment to Hartford. The judgment was therefore affirmed.
COMMENT
This case follows the traditional view that "property damage"
normally does not include, under the post-1973 policies, the incorporation of a
defective product into a completed project. It thus follows the
traditional view of what constitutes "property damage."
____
To order a printed version of this analysis,
or change your subscription information, reply to this transmission.
Information regarding this and other WEEKLY LAW RESUME TM articles is available from Raymond Coates at (650) 366-4000,
[email protected] or at WWW.LOWBALL.COM. The WEEKLY LAW RESUME TM is published fifty-two times a year, and is a
complimentary publication of LOW, BALL & LYNCH, Attorneys at Law, a
Professional Corporation, with offices in San Francisco, Redwood City and
Monterey, California.